Transformer bushings carry current through the transformer tank while electrically insulating the HV conductor from the earthed tank. Due to electrical, thermal, and mechanical stresses (during service), deficiencies in HV connection & test tap earthing connection may develop defects in the product and may lead to failure of the bushing.


HV Terminal Connection


HV terminal of the bushing is connected to transmission line through terminal connector. The material of HV terminal usually is copper and transmission line is of aluminium. The material used for terminal connectors is aluminium. Bimetallic (Cu-Al) sleeves are used between HV terminal and terminal connectors. The current passes from transmission line through terminal connector and through bimetallic sleeves to HV terminal of bushing. Effective current transfer from transmission line to HV terminal will result into lesser temperature rise over ambient temperature.


If there is inadequate clamping of terminal connector, it will result into higher contact resistance, and this results in higher heat generation and thus substantial increase in temperature at HV terminal level.


Undetected deficiencies in contacts at HV terminal, will lead to prolonged overheating leading to severe damage to O-Ring / gasket seals in vicinity of HV terminal & also may cause damage to oil indicator components.


Scanning by thermo-vision camera can detect such abnormality and overheating taking place at HV terminal joint of bushings.


Ingress of moisture due to damage to seals, and its effect on insulation quality is detected by Tan Delta measurements and DFR (Dielectric Frequency Response) measurements.


HV Terminal Connection Overheating Effects
HV Terminal Connection Overheating Effects

Preventive Actions for HV Terminal Connection Overheating


  • Ensure adequate contact area

  • Ensure proper seating and adequate clamping pressure (clamping of screws of terminal connector need to be done during periodic shutdowns)

  • Keep contact surfaces clean and free from contamination

  • Avoid damaging electroplated contact surfaces during cleaning

  • Perform visual inspection and IR thermography on routine basis (daily basis is recommended)

  • Verify terminal tightness during shutdowns


Test Tap Connection


Test tap is provided on each bushing to facilitate measurement of capacitance and Tan Delta measurements during testing at bushing and transformer factory & at site.


After the measurements are carried out, the test tap is required to be connected to earth before application of any voltage to the bushing.


A loose, or improperly grounded test tap connection will result in generation of dangerous overvoltages which may cause arcing and flashovers at test tap location & ultimately may lead to catastrophic failure of bushing.


Test Tap Assembly
Test Tap Assembly

Preventive Actions


  • After measurements are carried out, always fix the test tap cap, before application of voltage.

  • Ensure that the spring contact between test tap stem and test tap cap is effective.

  • Ensure that the sealing gasket between test tap cap and mounting flange is in position.



 
 